WEBVTT

00:00:00.560 --> 00:00:05.679
beings it's 530 you call the meeting to order madam clerk if you could call the

00:00:05.679 --> 00:00:14.640
roll please mayor Miller here Alderpersons Klemm here Johnson here Simmons is

00:00:14.640 --> 00:00:22.280
absent Parker here Stacy is absent Shadle here Sanders and Sellers are

00:00:22.280 --> 00:00:24.280
are absent, but we do have a quorum.

00:00:24.280 --> 00:00:26.280
Is there a quorum?

00:00:26.280 --> 00:00:42.280
I pledge allegiance to the flag of the United States of America and to the republic for which it stands, one nation under God, indivisible, with liberty and justice for all.

00:00:42.280 --> 00:00:50.899
Alright, we're down to approval of the agenda.

00:00:50.899 --> 00:00:52.899
So moved.

00:00:52.899 --> 00:00:54.899
Go ahead.

00:00:54.899 --> 00:01:02.899
Got a motion by Klemm, second by Johnson. All in favor? Aye. Opposed? That's approved.

00:01:02.899 --> 00:01:08.340
And public comments on agenda items. There was nothing listed, nothing there.

00:01:09.140 --> 00:01:15.379
And we'll move to discussion of the capital improvement plan by Manager Boyer and Director Richter.

00:01:15.379 --> 00:01:40.189
Miller. So many of these projects we've talked about and you have knowledge of, but I'm just

00:01:40.189 --> 00:01:56.969
going to hit the major ones. So as you all know, Hancock Bridge Deck is one of our major

00:01:56.969 --> 00:02:02.489
projects for next year. We need to get the guardrail and the bridge deck replaced. So

00:02:02.489 --> 00:02:07.530
We've budgeted for that in the capital plan, as well as the viaduct. They go hand in hand.

00:02:07.530 --> 00:02:12.650
Viaduct should have been done already, but due to various delays, whether it was some

00:02:12.650 --> 00:02:19.669
of our outside shareholders permit reviews and working with other utilities, it's taken

00:02:19.669 --> 00:02:23.409
some time. But we're getting together on the viaduct, but we've included that. There's

00:02:23.409 --> 00:02:28.889
work left to do in 26 for the viaduct. So once the viaduct's done, then we'll start

00:02:28.889 --> 00:02:38.490
We've listed funds in here for crack, ceiling, and repair work and hot mix.

00:02:38.490 --> 00:02:41.889
This is one of the items we want to make sure we protect that investment that we've made

00:02:41.889 --> 00:02:44.129
in our transportation system.

00:02:44.129 --> 00:02:47.229
The street maintenance plan, obviously we've discussed that.

00:02:47.229 --> 00:02:54.810
This is the 1% transportation tax that we currently collect on sales of items except

00:02:54.810 --> 00:02:59.930
for Food and Medicine and Medical Equipment.

00:02:59.930 --> 00:03:02.050
We've got the municipal lot.

00:03:02.050 --> 00:03:04.930
That is included in this year's capital plan.

00:03:04.930 --> 00:03:06.969
So that's a mill and overlay of the municipal lot.

00:03:06.969 --> 00:03:10.250
It's been needing it for quite a few years.

00:03:10.250 --> 00:03:12.849
So we'll get that done early next year.

00:03:12.849 --> 00:03:15.650
And then we've included the police department alley.

00:03:15.650 --> 00:03:17.370
This has been an item that's needed

00:03:17.370 --> 00:03:20.050
to be addressed for a very long time.

00:03:20.050 --> 00:03:24.250
and right now, this would be the time to get that done in 26.

00:03:25.449 --> 00:03:27.849
Also, you'll see the sidewalk project,

00:03:27.849 --> 00:03:30.889
South and West with ADA ramps.

00:03:30.889 --> 00:03:33.930
That one is funded through a HSP grant,

00:03:33.930 --> 00:03:37.050
$2.4 million that were outside funding,

00:03:37.050 --> 00:03:39.569
but we won't be working on that till 27,

00:03:39.569 --> 00:03:42.169
but we wanted it reflected here in the capital plan.

00:03:43.689 --> 00:03:47.610
Walnut as well, Walnut from South to Empire,

00:03:47.610 --> 00:03:53.530
that's approximately going to be a two-year project and we're working with IDOT STU funding

00:03:53.530 --> 00:03:55.930
for that project.

00:03:55.930 --> 00:04:05.729
Stevenson, Locust to Sunset, we're planning two years there, $750,000 for 26 and 27.

00:04:05.729 --> 00:04:10.289
That is also using STU IDOT money.

00:04:10.289 --> 00:04:15.849
And we're also looking at Lincoln Street, Locust to West, about $800,000 in two years

00:04:15.849 --> 00:04:22.129
Sanders, but in 26 we'll be utilizing about $400,000 next year, and that will also be

00:04:22.129 --> 00:04:26.009
STU funding through IDOT.

00:04:26.009 --> 00:04:28.529
We've got South Street programmed.

00:04:28.529 --> 00:04:34.850
We've added $250,000 here for our design work and that, but we have approximately anywhere

00:04:34.850 --> 00:04:35.850
between $4 and $7 million.

00:04:35.850 --> 00:04:42.649
I'm not entirely sure the total amount, but this was through John Cabello, who oversees

00:04:42.649 --> 00:04:47.490
He's iDOT who iDOT had come to him and said, hey, we don't have enough people to deploy

00:04:47.490 --> 00:04:48.490
all the funds.

00:04:48.490 --> 00:04:51.730
And he said, well, I've got some communities that could deploy the funds themselves.

00:04:51.730 --> 00:04:53.850
Why don't you just give them the funds?

00:04:53.850 --> 00:04:58.490
And that is how South Street, we will begin work on South Street next year.

00:04:58.490 --> 00:05:04.529
Walnut, Empire to Maine, we've put that out there at year 28.

00:05:04.529 --> 00:05:09.290
That's going to be a fairly expensive realignment and a lot of right-of-way work because the

00:05:09.290 --> 00:05:14.610
The road itself is narrow, too narrow for modern day standards, IDOT standards, so we're

00:05:14.610 --> 00:05:18.529
going to be working on that in 28.

00:05:18.529 --> 00:05:20.769
As well, we have Galena in here listed.

00:05:20.769 --> 00:05:26.449
We put some funding in here for various engineering that we might need, but this is an IDOT project.

00:05:26.449 --> 00:05:30.449
It's in the five-year plan, and next year they should start the project.

00:05:30.449 --> 00:05:35.569
It would be resurfacing Galena from Clark to Park, which is a pretty significant undertaking.

00:05:35.569 --> 00:05:42.970
Pateking. Again, they'll be working on ramps next year and then paving surfaces potentially

00:05:42.970 --> 00:05:48.290
next year and then the following years. And then we've also had West Galena to Empire

00:05:48.290 --> 00:05:53.250
that we've added here. Essentially, we just wanted an item to track it here in the capital

00:05:53.250 --> 00:05:59.730
plan moving forward. So that's everything on the road projects. Do you have any questions

00:05:59.730 --> 00:06:07.170
Huffines on the road project so far. Now, this includes the five-year plan. So when

00:06:07.170 --> 00:06:13.069
we go to the city website, we see the five-year plan down at the bottom of the page. Those

00:06:13.069 --> 00:06:18.269
are our local roads that we'll be doing, and those are accounted for under the street

00:06:18.269 --> 00:06:23.029
maintenance plan. So just so you know, just because you don't see the streets from the

00:06:23.029 --> 00:06:31.430
five-year plan for next year on here, they are included in this. Under buildings, police

00:06:31.430 --> 00:06:38.889
East Apartment Facility, continuing to keep that top of mind. That one is a fairly expensive

00:06:38.889 --> 00:06:45.089
challenge after some research. We came up with that it's going to be pretty expensive.

00:06:45.089 --> 00:06:50.170
So we're tracking that in the capital plan with the intention of getting things together

00:06:50.170 --> 00:06:55.490
and getting outside funding to help us with that. We've also included about $100,000

00:06:55.490 --> 00:06:59.329
for Tuck Pointing City Hall this year. We had originally planned to do that this year,

00:06:59.329 --> 00:07:05.410
We went ahead and did storm windows instead due to the fact that single pane, it's very

00:07:05.410 --> 00:07:07.970
cold in the winter time in Northern Illinois.

00:07:07.970 --> 00:07:12.009
The building has a hard time keeping up with heat and storm windows would have the most

00:07:12.009 --> 00:07:13.050
impact there.

00:07:13.050 --> 00:07:18.870
So we've kicked the tuck pointing to 26, and this won't be the entire thing.

00:07:18.870 --> 00:07:23.209
This will be probably just a portion of City Hall.

00:07:23.209 --> 00:07:28.170
Moving down here a little further for 26, we've got renovations budgeted for Island

00:07:28.170 --> 00:07:34.410
Davenue. If you haven't been down there recently, the building itself is just fully depreciated

00:07:34.410 --> 00:07:41.009
and in need of just some maintenance and some cleanup down there. In addition, we've got

00:07:41.009 --> 00:07:48.009
the $800,000 in for the salt sheds. We've talked about this at various times, but just

00:07:48.009 --> 00:07:54.050
open it up tonight. We have two large salt sheds that are a pole construction, and both

00:07:54.050 --> 00:07:59.990
Both of them are failing, the poles are rotted off at the base, and at this point we have

00:07:59.990 --> 00:08:02.829
the rear wall of one of them is pushing away from the truss system.

00:08:02.829 --> 00:08:08.529
So they're actually hazardous from a standpoint of you don't want people that are not enclosed

00:08:08.529 --> 00:08:12.829
in the cab of a loader or anything anywhere near it.

00:08:12.829 --> 00:08:18.170
So one of the plans there is to remove both of those salt sheds and then build a large

00:08:18.170 --> 00:08:23.149
concrete block impoundment with a large hoop shed on top, and that should be more than

00:08:23.149 --> 00:08:28.750
double the current capacity of our salt sheds. So that's planned for next year.

00:08:28.750 --> 00:08:34.549
We've got the airport terminal building. So we currently have some estimates out

00:08:34.549 --> 00:08:40.830
here about 1.8 million total, but our match would be about 190,000. We budgeted

00:08:40.830 --> 00:08:45.990
for the match and this would be built out largely with FAA money and state

00:08:45.990 --> 00:08:52.139
money with a 5% match from the city. We're also budgeting for the PAPI

00:08:52.139 --> 00:09:15.139
We've also budgeted for $400,000 for the fire department, for new windows, and just we have several different items there on the fire budget for ensuing years. You can look at those. If you have any questions on those, please let me know.

00:09:15.139 --> 00:09:19.139
You can look at those. If you have any questions on those, please let me know.

00:09:19.139 --> 00:09:23.139
If we could move on to water infrastructure.

00:09:23.139 --> 00:09:29.919
So the first one there is water main

00:09:29.919 --> 00:09:33.919
water main replacements. So that's essentially whenever we do a

00:09:33.919 --> 00:09:37.919
road program, we evaluate the water main. If it needs to be replaced, then we replace

00:09:37.919 --> 00:09:41.919
that water main. It also gives us an opportunity to budget for that, and that's reflected here

00:09:41.919 --> 00:09:45.919
in the capital plan as water main money that will be working

00:09:45.919 --> 00:09:50.799
together with our street reconstruction money.

00:09:50.799 --> 00:09:53.840
Also there's a component of that that is the viaduct.

00:09:53.840 --> 00:09:55.559
That is why it's listed.

00:09:55.559 --> 00:09:59.720
We've also added a phase four of the lead service line replacement program, which is

00:09:59.720 --> 00:09:59.960
Sarf.

00:09:59.960 --> 00:10:28.000
We've talked about it many times, and well 12, we've recently drilled the test well down to I think about 1800 feet or 1300, I'm sorry, 1300 feet and take a look at it again. So that's the lead service line replacement program, which is our final phase, and we should be completing that hopefully in 2026. So very excited about that. Again, the lead service line is 100% loan forgiveness through the EPA. Water structures phase three, which is well 12. We've talked about it many times, and well 12, we've recently drilled the test well down to I think about 1800 feet or 1300, I'm sorry, 1300 feet and take a look at it again.

00:10:58.000 --> 00:11:09.879
Soon. Also, you'll see here we've got water main phase four, phase five. That's just us keeping track of as we go through and do the road program that we have enough money here to do the water main.

00:11:10.639 --> 00:11:24.120
Obviously, if we don't replace the water main, just we don't want to invest in the transportation infrastructure and then have the water main ruin it. So we do have about 60% of our city is comprised of this low grade

00:11:24.120 --> 00:11:32.100
and Spuncast Water Main, which is notoriously weak and is old and is in many cases corroded.

00:11:32.100 --> 00:11:35.259
So every time we do those roads, we're going to evaluate that, make sure the water main

00:11:35.259 --> 00:11:41.220
is quality. If it is, we'll leave it. If it's not, we'll replace it. Backup generator

00:11:41.220 --> 00:11:47.480
for Carroll. That's in the plan for next year. As we've discussed, I have certain utility

00:11:47.480 --> 00:11:53.340
infrastructure remote sites like Carroll that provide, I think in this case, about 1.7 million

00:11:53.340 --> 00:11:58.340
We have a total of 15 gallons per day of water to the city, but there is no backup capacity there.

00:11:58.340 --> 00:12:11.340
We essentially have one large towable generator that we would, in an emergency, maybe an ice storm, have to take around to each of all of our remote sites, and to me that's inherently unsafe and not a great plan.

00:12:11.340 --> 00:12:17.340
So we are slowly but surely upgrading our remote sites with backup generation capacity.

00:12:17.340 --> 00:12:25.539
If you skip down to Cold Storage Brick Street, that's an extension to the Brick Street Storage Shed that is necessary.

00:12:25.539 --> 00:12:32.340
We've consolidated, due to the work at the wastewater treatment plant, we've had to move equipment up to Brick Street.

00:12:32.340 --> 00:12:42.340
With that, we need an extension on that building so that we can keep our cold storage materials undercover.

00:12:42.340 --> 00:12:47.680
and then lastly here on the water side we have the willow tank rehab we're

00:12:47.680 --> 00:12:52.220
budgeting about a million dollars for the willow tank it's a ground ground

00:12:52.220 --> 00:12:56.460
level storage tank that runs off of booster pumps when it was originally

00:12:56.460 --> 00:13:01.819
purchased and installed there the appropriate man hatches and things that

00:13:01.819 --> 00:13:05.700
are required for maintenance were not put in at the time so the only hatch in

00:13:05.700 --> 00:13:10.539
it is at the very top and we need to upgrade that so that it's safe for our

00:13:10.539 --> 00:13:15.539
We need our personnel to get inside and do the appropriate maintenance that it will require over the years.

00:13:15.539 --> 00:13:18.539
Any questions on the water infrastructure side?

00:13:18.539 --> 00:13:21.539
Yes.

00:13:21.539 --> 00:13:29.539
The airport water main extension, what is that?

00:13:29.539 --> 00:13:36.539
Well, one of the challenges out here is for anything to happen at the airport,

00:13:36.539 --> 00:13:44.039
We need to supply water to the airport in sufficient volume and flow for fire suppression.

00:13:44.039 --> 00:13:49.539
So one of the things we're hoping to work on here moving forward in the ensuing years

00:13:49.539 --> 00:13:57.539
is getting water from the utility out to the airport so that we have sufficient volume and flow for fire suppression in the hangar buildings.

00:13:57.539 --> 00:14:03.539
As we go along, fire code is becoming more and more restrictive

00:14:03.539 --> 00:14:04.539
and David.

00:14:04.539 --> 00:14:10.200
And if we hope to make the airport into a regional maintenance facility, then we need

00:14:10.200 --> 00:14:15.399
to have sufficient volume and flow of water for those fire suppression systems.

00:14:15.399 --> 00:14:20.360
And you've already set aside money for this?

00:14:20.360 --> 00:14:22.279
Well, this is the capital plan.

00:14:22.279 --> 00:14:24.740
This is what we're looking to do.

00:14:24.740 --> 00:14:31.519
And this, every year beyond 26 will change slightly depending on the facts on the ground.

00:14:31.519 --> 00:14:38.720
So this could move out a year, this could happen, it depends on the other priorities

00:14:38.720 --> 00:14:39.720
at that time.

00:14:39.720 --> 00:14:45.799
Okay, so is this capital plan $4 million?

00:14:45.799 --> 00:14:50.759
Right now, yes, we put $4 million in the capital plan for the Watermain extension to the airport.

00:14:50.759 --> 00:14:54.000
And when do you plan on doing this?

00:14:54.000 --> 00:14:55.879
We have it programmed for 2027.

00:14:55.879 --> 00:15:15.789
I'll take that.

00:15:15.789 --> 00:15:21.069
and I'm available if you have any other questions on that, we can definitely talk about that.

00:15:21.069 --> 00:15:27.039
But in the interest of time, I'd like to move on to wastewater infrastructure. We're coming

00:15:27.039 --> 00:15:35.039
to the end of phase one, which is the SEP system, the headworks, the UV disinfection,

00:15:35.039 --> 00:15:43.019
the new lab and offices at Hancock. As you'll see there, we need to start planning for future

00:15:43.019 --> 00:15:51.819
and it's going to be a sludge handling and nutrient removal.

00:15:51.819 --> 00:15:56.860
So those are some things that we'll talk about a little later during the council meeting.

00:15:56.860 --> 00:16:00.339
I have some information to share on that.

00:16:00.339 --> 00:16:06.660
But just moving forward, we're planning for phase two on the wastewater side.

00:16:06.660 --> 00:16:08.480
We've also got lining.

00:16:08.480 --> 00:16:11.100
We're planning about $500,000 for sewer lining.

00:16:11.100 --> 00:16:14.100
We also have some manhole rehab there.

00:16:14.100 --> 00:16:22.100
And then we're looking as we move forward, we're going to be needing to upgrade and update our final clarifiers at the wastewater treatment plant.

00:16:22.100 --> 00:16:29.100
So you have flocculation sedimentation, and those clarifiers perform that.

00:16:29.100 --> 00:16:33.460
We're going to be needing to upgrade and update our final clarifiers at the wastewater treatment

00:16:33.460 --> 00:16:34.460
plant.

00:16:34.460 --> 00:16:43.500
So you have flocculation, sedimentation, and those clarifiers perform that work as it ends

00:16:43.500 --> 00:16:45.620
the treatment process.

00:16:45.620 --> 00:16:48.259
And they haven't been updated in many years.

00:16:48.259 --> 00:16:54.200
And we're going to be moving forward with some upgrades to those in ensuing years.

00:16:54.200 --> 00:16:56.740
We've also got lift stations remodeled.

00:16:56.740 --> 00:17:04.139
So we've got approximately two million dollars programmed for the park in Galena Lift Station.

00:17:04.139 --> 00:17:10.740
There's new drivers, motors, and pumps that need to be replaced at three of these next

00:17:10.740 --> 00:17:11.740
year.

00:17:11.740 --> 00:17:15.139
So we're working on that now.

00:17:15.139 --> 00:17:19.900
Coming to the end here, again, Walnut Lift Station is in here, 2.7 million.

00:17:19.900 --> 00:17:25.940
So this would also be upgrades, necessary upgrades and updates to the Walnut Lift Station.

00:17:25.940 --> 00:17:31.420
and then we have the blower boiler room piping at the wastewater treatment plant.

00:17:31.420 --> 00:17:37.619
I believe we've got issues there in terms of the heat exchangers, the things that keep

00:17:37.619 --> 00:17:40.980
the sludge digesters working properly.

00:17:40.980 --> 00:17:44.940
So we've accounted for some upgrades there.

00:17:44.940 --> 00:17:49.500
And then we have $1.2 million budgeted for the Meadowbrook sewer expansion.

00:17:49.500 --> 00:17:59.139
So that is from La Crusta and then connecting, going north and south along Meadow Brook and

00:17:59.139 --> 00:18:03.400
then potentially connecting into Oak Hill.

00:18:03.400 --> 00:18:08.940
So we had been waiting on outside funding for this, but we've been waiting for five

00:18:08.940 --> 00:18:15.779
years and at this point the road is degraded to a sufficient point where we really just

00:18:15.779 --> 00:18:16.779
Neistat.

00:18:16.779 --> 00:18:21.779
We just need to get the sewer, gravity sewer done, and then we can resurface that road.

00:18:21.779 --> 00:18:27.799
And the same thing, we've got West Demeter does, that needs a sewer upgrade as well,

00:18:27.799 --> 00:18:31.000
so we'll be installing collection system there.

00:18:31.000 --> 00:18:33.000
Any questions on the wastewater infrastructure?

00:18:33.000 --> 00:18:34.000
Alderman Seller.

00:18:34.000 --> 00:18:39.220
Yes, I'd just like to know, how many lift stations do we actually have in?

00:18:39.220 --> 00:18:40.220
I want to say seven.

00:18:40.220 --> 00:18:41.220
Nine.

00:18:41.220 --> 00:18:42.220
Nine, okay.

00:18:42.220 --> 00:18:48.539
Okay. And how often do they need this type of repair? Well, these are the bigger ones, Joy. So

00:18:49.500 --> 00:18:56.460
probably every 20 years. Yeah. Yep, go on. So the stations that we're upgrading this year,

00:18:58.139 --> 00:19:05.579
Park and Laurel were built in 1967. And we've done some small mechanical work now and then. But

00:19:05.579 --> 00:19:10.940
this will be the first major overhaul of these since their inception. So they've lasted quite

00:19:10.940 --> 00:19:19.700
and I will comment that a lot of these remote sites, they generally function pretty well

00:19:19.700 --> 00:19:21.659
during normal operation.

00:19:21.659 --> 00:19:28.139
The challenge comes in when we have heavy rains and we have I&I making its way to the

00:19:28.139 --> 00:19:29.139
wastewater plant.

00:19:29.139 --> 00:19:34.340
It can cause a serious backup in a large section of a drainage shed pretty quickly.

00:19:34.340 --> 00:19:39.500
So when we are spending some money upgrading these, what we are doing here is ensuring

00:19:39.500 --> 00:19:43.139
that folks with basements, floor drains, net,

00:19:43.139 --> 00:19:45.860
will be much more capable, able to handle

00:19:45.860 --> 00:19:52.299
any kind of storm surge in out in the collection system.

00:19:52.299 --> 00:19:57.269
A couple other things, moving on to storm water.

00:19:57.269 --> 00:19:58.070
We have a handful.

00:19:58.070 --> 00:20:01.170
We have a handful of projects here. We've got the storm inlet replacements. We're

00:20:01.170 --> 00:20:07.569
planning to do, how many was that? Was that about 30? About 30 this year or 26? Yeah.

00:20:07.569 --> 00:20:13.410
Okay. Obviously all around town and I think Alderman Parker noted one just

00:20:13.410 --> 00:20:17.809
over by him that had a bed, a failed grate. We have a lot of brick structures

00:20:17.809 --> 00:20:22.609
out there that a mortar gets eroded away. The bricks fall in and then what you

00:20:52.609 --> 00:21:22.609
Gray did that here. And we've been, for years, we've been planning on a downtown stormwater upgrade that includes repairing of the, the, uh, large vi, I guess it's a viaduct. It's a big, a large storm, uh, way down at Benton and Jackson. It's, uh, made out of wood and the wood is getting old and we're, I would not want that structure to, um, uh, create a problem for drainage, uh, during a heavy storm. So that's been on the plan for probably five years.

00:21:22.609 --> 00:21:52.609
Moving into some street vehicles. We've currently in 26, we're not planning to purchase any new 10 or 5 yards, at least out of the street department. We are going to be purchasing two dump bodies for the hook lift trucks. As everybody remembers, we ordered two hook lift trucks back in 2019, I believe, we then take delivery to like 2021. And those were only outfitted with salt boxes. So they basically sit in the shed for most of

00:21:52.609 --> 00:22:00.369
We're going to order dump bodies so we can use them in construction projects.

00:22:00.369 --> 00:22:02.809
Also we're planning to purchase a new roller.

00:22:02.809 --> 00:22:08.130
We need an additional roller for the street department and so that's included here.

00:22:08.130 --> 00:22:09.849
Any questions on street vehicles?

00:22:09.849 --> 00:22:10.849
Yep.

00:22:10.849 --> 00:22:20.230
So, it's like a dump truck, except these two trucks, their chassis is fitted with like

00:22:20.230 --> 00:22:21.230
and so on.

00:22:21.230 --> 00:22:29.990
It's like a hydraulic hook and you back up to the, let's say, the salt, the spreader

00:22:29.990 --> 00:22:31.389
and the salt box.

00:22:31.389 --> 00:22:35.430
It just reaches up under there, hooks it, and then pulls it up on the chassis and then

00:22:35.430 --> 00:22:36.910
locks it down.

00:22:36.910 --> 00:22:40.690
So whenever you buy any kind of it, so these trucks are great because they're flexible.

00:22:40.690 --> 00:22:45.829
They could do salt in the wintertime with a V-Box splitter and a spreader and you take

00:22:45.829 --> 00:22:46.829
that off.

00:22:46.829 --> 00:22:56.829
We ordered two new trucks in 2019. We received them in, I think, 21. And because they only have the salt, they have the V-Box and the salt spreader and then a leaf box when they come out.

00:22:56.829 --> 00:23:23.470
Yeah, we ordered two new trucks in 2019. We received them in I think 21. And because they only have the salt, they have the V-Box and the salt spreader and then a leaf box, we'll use them for a few months every year. So by getting these two dump bodies, we'll be able to utilize them all year.

00:23:23.470 --> 00:23:27.069
Well, how much did we pay for those that we are not even using?

00:23:27.069 --> 00:23:32.470
Well, I mean, they're about $225,000 or so each.

00:23:32.470 --> 00:23:36.309
And like I said, we use them in the winter and we use them in the fall.

00:23:36.309 --> 00:23:40.069
But by getting these two boxes, we'll be using them all year.

00:23:40.069 --> 00:23:43.549
OK, but what are we going to do with the equipment we have setting?

00:23:43.549 --> 00:23:48.029
Is this something we could get some money back on, or?

00:23:48.029 --> 00:23:50.869
Actually, this would be adding to, so we'd be adding

00:23:50.869 --> 00:23:57.950
to the capabilities of these two trucks. We've taken them from a leaf machine or a salt box

00:23:57.950 --> 00:24:02.630
to a utility box where we can haul rock and things for the construction.

00:24:02.630 --> 00:24:07.869
Okay, the equipment that is sitting, will we ever use it?

00:24:07.869 --> 00:24:10.750
Yes, we use it every year.

00:24:10.750 --> 00:24:18.990
But when we get these two that you're wanting, will we use that other equipment?

00:24:18.990 --> 00:24:23.389
Yes, these are, these are dump bodies.

00:24:23.990 --> 00:24:28.470
So in the summer we can have dump trucks out of these trucks and it gets to the

00:24:28.470 --> 00:24:33.869
winter, they'll take the dump box off, put the salt spreader box on.

00:24:34.389 --> 00:24:34.789
Yes.

00:24:34.829 --> 00:24:35.990
And we'll use that.

00:24:36.869 --> 00:24:38.389
I understand that part.

00:24:38.789 --> 00:24:43.269
I just don't understand the two from 2021 sitting.

00:24:43.309 --> 00:24:44.309
That's the trucks.

00:24:44.910 --> 00:24:46.190
That's the truck chassis.

00:24:46.190 --> 00:24:53.360
these are different components that go on the back of that same truck it'll just

00:24:53.360 --> 00:24:57.599
mean we can use those two trucks all year long instead of just in the winter

00:24:57.599 --> 00:25:03.200
and in the fall I just don't want us purchasing unnecessary material that in

00:25:03.200 --> 00:25:07.279
a couple years it's not going to serve no purpose and now we're going to be in

00:25:07.279 --> 00:25:12.920
thousands of dollars ordering more like we are Alderman Stacey I'd be happy to

00:25:12.920 --> 00:25:16.000
take you down and introduce you to the vehicles and maybe we can go for a ride

00:25:16.000 --> 00:25:25.660
With that, we're itemizing, as you can see in the capital plan, we're breaking this out. We're being more thorough about what's in it.

00:25:25.660 --> 00:25:31.660
So we've broken out the utility vehicles this year. That's kind of a change from previous years.

00:25:31.660 --> 00:25:36.660
So we're budgeting for a 10-yard dump truck for the Water and Sewer Department for 26.

00:25:36.660 --> 00:25:45.660
Also a mulching head for our mini excavator that helps us keep right-of-ways clear from trees and bushes and things that grow up.

00:25:45.660 --> 00:25:52.220
Krohup, and then the crew cab truck, we've got two service trucks that are in the budget

00:25:52.220 --> 00:25:59.860
for the utility this year, so any questions on any of that?

00:25:59.860 --> 00:26:08.380
Obviously, the next one here is police vehicles, so we've itemized four police vehicles.

00:26:08.380 --> 00:26:12.180
That's kind of a standard every year we need to replace four.

00:26:12.180 --> 00:26:17.019
Then we've added a golf cart for the police, because when they do events and things, this

00:26:17.019 --> 00:26:33.360
We've also added a live video camera trailer and radar trailer as well as 20 additional

00:26:33.360 --> 00:26:40.799
Skydio, X-Drone, Mobile Command Trailer, and Portable Radios, bearing in mind that a good

00:26:40.799 --> 00:26:47.279
portion of these items are funded from Senator Durbin for police money.

00:26:47.279 --> 00:26:54.139
We received about $600,000 from Senator Durbin, so this is congressionally directed, yes.

00:26:54.139 --> 00:26:58.639
What is a live video camera trailer and radar trailer?

00:26:58.639 --> 00:27:02.500
So this is a trailer where you park, crank up the boom, and it's got multiple cameras

00:27:02.500 --> 00:27:22.690
We already have this? Is that what's on Galena right now by the store?

00:27:22.690 --> 00:27:26.049
Yes. So with this, we are actually getting a couple of different things.

00:27:26.049 --> 00:27:29.889
One is a trailer that's like a speed trailer and an LPR and the other one

00:27:30.450 --> 00:27:33.329
is a surveillance trailer where we would also use it for

00:27:33.329 --> 00:27:39.170
Moore, Major Vance, Teddy Baker Days, things like Cruise Night, where you can monitor a

00:27:39.170 --> 00:27:44.130
crowd from one point so that we can see what's going on.

00:27:44.130 --> 00:27:45.130
Okay.

00:27:45.130 --> 00:27:51.329
Well, I'm speaking about this trailer-looking theme that's on Galena as I speak with a blue

00:27:51.329 --> 00:27:52.329
light.

00:27:52.329 --> 00:27:53.329
Yes.

00:27:53.329 --> 00:27:56.000
Okay.

00:27:56.000 --> 00:27:57.000
Okay.

00:27:57.000 --> 00:28:00.880
And then moving on to fire, and then I should wrap it up for this evening's capital plan.

00:28:00.880 --> 00:28:09.039
We've got a budgeted VHF radio network, replacing hose nozzle appliances, firefighter turnout

00:28:09.039 --> 00:28:12.360
gear, that's the more expensive item.

00:28:12.360 --> 00:28:17.319
Some of the turnout gear for the firemen contain forever chemicals.

00:28:17.319 --> 00:28:24.079
So we want to retire the turnout gear that has those chemicals and replace it with the

00:28:24.079 --> 00:28:29.039
new, new designs that don't.

00:28:29.039 --> 00:28:33.240
and then the other items, you know, we've got an ambulance, a chair for your ambulance

00:28:33.240 --> 00:28:38.880
and some environmentally friendly firefighting foam.

00:28:38.880 --> 00:28:43.440
So that pretty much covers the capital plan for 26.

00:28:43.440 --> 00:28:46.720
So any other questions on that?

00:28:46.720 --> 00:29:04.320
I had a question on the first page, terminal, airport terminal updates.

00:29:04.320 --> 00:29:05.320
Yes.

00:29:05.320 --> 00:29:12.599
Something about 5% matchable from the city. What does that mean?

00:29:12.599 --> 00:29:21.599
So we're budgeting $1.8 million for the terminal building update. So the building is there. The interior needs to be built out.

00:29:21.599 --> 00:29:29.599
Our estimates based on Crawford Murphy Tilly, who's our airport engineers, they're estimating it's going to be about $1.8 million total.

00:29:29.599 --> 00:29:44.200
90% of this 1.8 will come from the FAA itself and then 5% will come from the state and then 5% would be a city match and that'll come out to around $190,000.

00:29:44.200 --> 00:29:47.200
And so where do this 5% come from? Texas?

00:29:47.200 --> 00:29:48.200
Yes.

00:29:48.200 --> 00:29:55.920
Okay, so that's five percent for the airport and

00:29:55.920 --> 00:29:59.000
and 4.94% for the library.

00:30:00.319 --> 00:30:03.680
Well, that's, those aren't connected.

00:30:05.880 --> 00:30:08.039
5% of that project.

00:30:09.000 --> 00:30:09.839
Yeah.

00:30:09.839 --> 00:30:13.720
The project total, it's 5% of that.

00:30:13.720 --> 00:30:16.119
And when do we plan on doing this?

00:30:16.119 --> 00:30:16.960
Next year.

00:30:18.039 --> 00:30:19.559
So we're gonna put water

00:30:19.559 --> 00:30:29.390
and an additional terminal work all at the airport.

00:30:32.630 --> 00:30:34.990
Well, the terminal needs to be finished.

00:30:34.990 --> 00:30:36.910
And yes, we're going to do that.

00:30:36.910 --> 00:30:40.430
And we're budgeting for 2027 for water to go out

00:30:40.430 --> 00:30:43.269
to the airport, not for the terminal specifically,

00:30:43.269 --> 00:30:46.390
but for basically for fire suppression needs

00:30:46.390 --> 00:30:47.789
at the airport in general.

00:30:47.789 --> 00:30:50.269
We haven't had it in all these years.

00:30:50.269 --> 00:30:53.950
Now all of a sudden, we need water at the airport.

00:30:55.990 --> 00:30:58.829
Well, I have actually been working on that for a number of years.

00:31:01.349 --> 00:31:03.869
So, can I clarify something?

00:31:04.190 --> 00:31:10.670
So the number that's put in for 2027, if you look at the note, we're just researching

00:31:10.670 --> 00:31:18.069
grant opportunities for that water through the aviation mechanisms or other programs.

00:31:18.069 --> 00:31:21.390
That's not specific money that's coming right out of Freeport's budget.

00:31:21.549 --> 00:31:44.000
I know you talked about the police department and you said that's going to be a pretty big budget. What are we all looking for for the police department? Are we looking new? Are we looking to fix up? What is all that going to be?

00:31:44.000 --> 00:31:52.000
So, I mean, the two main options are going to be construction, new construction, or it's going to be retrofit existing structure.

00:31:52.000 --> 00:31:57.000
On new construction, it's going to range anywhere from $300 to $600 per square foot.

00:31:57.000 --> 00:32:03.000
And on retrofit of existing structure, it's probably going to knock about $100 per square foot off of that.

00:32:03.000 --> 00:32:09.000
So anywhere between $200 and $500 per square foot, depending upon the section of the PD and that.

00:32:09.000 --> 00:32:14.519
Att. So we've done some research. We've visited quite a few different newer police stations.

00:32:15.480 --> 00:32:20.039
We're estimating we'll need somewhere around 30,000 square feet for the new police department.

00:32:20.920 --> 00:32:26.200
So that would be more than doubling what we have now in square footage. Part of the reason for that

00:32:26.200 --> 00:32:31.880
is policing techniques, the way things are set up. This is the way things are done today and have

00:32:31.880 --> 00:32:38.440
been for many years. So we've been kind of making do since the 70s. But when we move, when we take

00:32:38.440 --> 00:32:40.240
We're gonna take it to the next level.

00:32:40.240 --> 00:32:42.819
We're gonna bring things up to speed to where they need to be,

00:32:42.819 --> 00:32:45.319
what modern policing requires today.

00:32:46.860 --> 00:32:48.519
Did I answer your question, Joy?

00:32:48.519 --> 00:32:51.740
Mm-hmm, just wondering if you are, you know, looking at new,

00:32:51.740 --> 00:32:53.900
or are you looking at reconstruction, what are we...

00:32:53.900 --> 00:32:57.200
I think we're looking at the most feasible thing to do,

00:32:57.200 --> 00:33:01.819
and it's probably gonna be retrofitting an existing structure.

00:33:01.819 --> 00:33:03.960
That'd probably be the most likely.

00:33:03.960 --> 00:33:06.500
However, it's completely dependent upon funding

00:33:06.500 --> 00:33:07.839
and where that funding comes from.

00:33:07.839 --> 00:33:11.960
Tomorrow, we get congressionally directed funding for something, it might change the

00:33:11.960 --> 00:33:12.960
whole thing.

00:33:12.960 --> 00:33:13.960
Okay.

00:33:13.960 --> 00:33:18.990
Thank you.

00:33:18.990 --> 00:33:21.849
Okay.

00:33:21.849 --> 00:33:22.849
Thank you.

00:33:22.849 --> 00:33:23.849
Thank you.

00:33:23.849 --> 00:33:24.889
We'll move on.

00:33:24.889 --> 00:33:33.799
Any public comments, agenda or non-agenda items?

00:33:33.799 --> 00:33:38.110
Seeing none, I would take a motion for adjournment.

00:33:38.110 --> 00:33:39.710
Motion by Sellers, second by Johnson.

00:33:39.710 --> 00:33:40.710
All in favor?

00:33:40.710 --> 00:33:41.710
Aye.

00:33:41.710 --> 00:33:42.710
Aye.

00:33:42.710 --> 00:33:43.710
Opposed?

00:33:43.710 --> 00:33:44.470
Thank you.